Paloma Ridge
Project Overview
Axis Solar is proud to announce the successful installation and commissioning of the Paloma Ridge solar project in Austin, Texas, a collaborative effort led by Radial Power. This groundbreaking project, featuring both rooftop and carport solar installations, is a significant stride towards sustainable energy solutions, marking it as the largest solar initiative connected to Austin Energy.
With a capacity of 3.35 MWdc, Paloma Ridge now benefits from state-of-the-art solar technology that not only supports environmental conservation by offsetting over 3,400 metric tons of CO2 annually but also enhances the property’s value. This initiative aligns with our mission to drive positive change through renewable energy, underscoring our commitment to sustainability and showcasing our expertise in the field. The project stands as a testament to our collaborative efforts with Starwood Capital Group and our dedication to delivering long-term value and benefits towards sustainable commercial goals.
‟I am thrilled to share our experience working with Axis Solar, who has been instrumental in making our ambitious renewable energy project a resounding success. As the COO of Radial Power, overseeing the largest behind-the-meter solar installation in Austin Energy’s service area, I can confidently say that Axis Solar’s exceptional services have been pivotal to our project’s success.
Axis Solar’s expertise in handling highly complex carport and rooftop elements, coupled with their ability to manage crane access logistics, truly sets them apart. Their technical proficiency ensured that our project proceeded without a hitch.Ed KentCOO, Radial Power
Project Specs
- Owner:
- Radial Power LLC
- Type:
- Rooftop & Carport
- Location:
- Austin, Texas
- Tax Credits:
- –
- Year 1 Savings:
- $466,187.34
- Estimated 25 Year Savings:
- $11,654,684.00
- Estimated Payback:
- –
- Type:
- Solar PV Rooftop & Carport
- Size of System:
- 3,353 kW
- Purpose:
- Reduce Carbon Footprint, Annual Savings
- Suppliers:
- ZN Shine, CPS, Tigo, Unirac
- Installation Start Date:
- 05/2023
- Installation Finished:
- 10/2023
- Utility:
- Austin Energy